Beaverdam Elementary School

beaverdam-int-3907-(ZF-4699-81083-1-006).jpg

This brand new 110,000 square foot building was constructed with CMU and conventional steel components.  

The project included complete turnkey site construction of an 18.25-acre site that included all site infrastructure, site utilities, city streets and NCDOT roadway improvements.


River Bend Middle School

m13-riverbend-ext-3570b-(ZF-10445-23699-1-020).jpg

This prototype three-story, 1,280-student Middle School was built near Riverbend Elementary in northeast Raleigh. It was constructed with CMU and conventional steel components.

The project included a completed turnkey site construction of a 23-acre site that included all site infrastructure, site utilities, city streets and NCDOT roadway improvements.


Guilford County Peck K-8 Learning Center

Guilford County Peck K-8 Learning Center

Greensboro, NC 

This project includes a new three-story, approximately 140,000 SF K-8 Expeditionary Replacement Learning Magnet School with associated site improvements, site access, parking and complete system upgrades for the new K-8 school.


West Mecklenburg High School Gymnasium

This project included 35,000 SF of new High School gymnasium. Project included all new ticketing and concessions with state-of-the art locker rooms.


South Mecklenburg High School

south-mecklenburg-hs-clt-ext-3918-(ZF-5284-73464-1-002).jpg

South Mecklenburg High School Expansion

Charlotte, NC

The South Mecklenburg High School Renovation and Expansion project in Charlotte, NC, replaced the two oldest buildings on campus, which date back to the school’s original construction in 1958. The 13,000-square foot renovation includes an upgrade to the existing cafeteria and addition of new cafeteria and kitchen space. The new 44,000-square foot classroom building features 30 additional classroom spaces to accommodate the school’s growing population.


Grand Strand Nissan and Service Center

Untitled_HDR4.jpg

This 5,600 sq ft renovation project focused on the showroom, sales, and administrative spaces.

Creating a larger showroom, expanding the customer lounge and adding a playroom rounded out the interior overhaul. The building’s exterior was re-framed for storefront windows and Ford’s metal panel finishing, and now meets new hurricane standards.  


Woodland Terrace

IMG_9561HDR.jpg

The Bistro at Woodland Terrance Senior Living

This upfit project upgraded finishes including flooring, paint, and wall coverings. New cabinetry, lighting, and other aesthetic improvements create cozy feel of home for guests.


Phononic Devices

IMAG0629.jpg

This 15,000 square foot project includes 5,000 sq ft of office and 10,000 sq ft of clean-room space.  

The project scope included a new remote terminal unit and mechanical coordination and was completed 2 weeks ahead of schedule — without disruption to the existing operations.


Winestore

Shuckin' Shack Oyster Bar

DSC_1328.jpg

The renovation Project required significant repair of the wood structure and the addition of steel beams to support the floor above.

Only the wood on the wall and exposed brick remain of the original interior. This project was our first collaboration with the Shuckin' Shack Franchise.


North Strand Nissan

north-strand-nissan-int_5512-(ZF-1542-89748-1-010).jpg

North Strand Nissan was anew ground-up construction project of a 27,419 square foot, two story automotive dealership.

The project followed the NREDI 1.5 Standards. The dealership consists of a showroom, a customer lounge, new car delivery space and state of the art service bay and detail shop. The structure sat among a larger area lot for vehicle display, customer and employee parking.


Laney High School

Laney-high-school-ext_5848-(ZF-10445-23699-1-009).jpg

The new 1,600 seat, 60,000 square foot gymnasium features renovated locker rooms, new coaches offices, and a new lobby with a concessions area and public restrooms.  

And the new media center totals 11,100 square feet and features a “maker-space lab” for students to create hands-on, 3-D projects such as printing, sewing and soldering.


Northpark Church

4Q3A2825_7_8_9-Editweb.jpg

This new 2,800 square foot building was built in the location of a former facility on campus.

The modern structure includes a gathering space, fellowship hall, offices, and restrooms. Construction materials include wood studs and wood roof trusses with a corrugated metal panel exterior.